2015 Summary of Staff 11.1 Reviews | ||||||||
Date | Address | File Number | District/Status |
Project Description | State/Fed Programs |
Staff
finding to SHPO |
SHPO
Determination |
|
1/12/2015 | 412 5th Street | 15CM001 | Downtown
Contributing |
Replace existing white sliding metal door with white overhead metal door of the same dimensions | Yes | No staff finding was made for this project | No
adverse effect |
|
2/13/2015 | 823 St. Cloud | 15RS001 | West
Boulevard Contributing |
Replace five basement windows. Four are aluminum windows, one is an existing glass block window that will be replaced to match the others. | No | No
adverse effect |
No
adverse effect |
|
2/27/2015 | 1018 11th Street | 15CM002 | Downtown
Contributing |
Rehabilitate interior elevators with new cars, motors, and electrical equipment | No | No
adverse effect |
No
adverse effect |
|
3/4/2015 | 523 6th Street | 15CM003 | Downtown
Contributing |
Paint walls, replace ceiling grid, replace ceiling tiles, replace light fixtures - all non - historic | Potential | No
adverse effect |
No
adverse effect |
|
3/11/2015 | 1007 9th Street | 15RS002 | West
Boulevard Contributing |
Replace two basement windows on non-primary façade with Pella metal clad/wood windows. Opening size will be changed to meet egress requirements. | No | No
adverse effect |
No
adverse effect |
|