PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Preliminary Plat be approved with the following stipulations:
Engineering Division Recommendations:
1. Prior to Preliminary Plat approval by the City Council, a revised
drainage plan shall be submitted for review and approval. In addition,
the plat document shall be revised to show additional drainage easements
as needed;
2. Prior to Preliminary Plat approval by the City Council, revised
water and sewer plans shall be submitted for review and approval.
In addition, the plat document shall be revised to show additional
utility easements as needed;
3. Prior to Preliminary Plat approval by the City Council, all necessary
changes shall be made to the construction plans as identified on the
red lined drawings. In addition, the red lined drawings shall be returned
to the
Engineering Division:
4. Prior to Final Plat approval by the City Council, the plat document
shall be revised to show a non-access easement along Cambell Street
except for the approved approach location;
5. Prior to Final Plat approval by the City Council, the plat document
shall be revised to show ten additional feet of right-of-way along
Cambell Street;
6. Prior to Final Plat approval by the City Council, the plat document
shall be revised to show 23 additional feet of right-of-way along
Philadelphia Street with the exception of the area currently occupied
by existing building(s);
Fire Department Recommendations:
7. The Uniform Fire Code shall be continually met;
Emergency Services Communication
Center Recommendation:
8. Prior to Final Plat approval by the City Council, the plat title
shall be revised to delete "located in" and the following
shall be included in the "formerly" description: SW1/4 SW1/4,
Section 32, T2N, R8E, BHM";
Urban Planning Division Recommendations:
9. Prior to Final Plat approval by the City Council, the structure
located on proposed Lot 2 shall be removed or a Variance to reduce
the front yard setback from 35 feet to 8.5 feet shall be obtained
or surety shall be posted to insure that the setback issue is addressed
as identified;
10. Prior to Final Plat approval by the City Council, documentation
shall be submitted indicating that Black Hills Power concurs with
the proposed relocation of the 50 foot wide right-of-way utility easement;
11. Prior to Final Plat approval by the City Council, the applicant
shall enter into an agreement with the City stating that if the building
or that portion of the building located within the north 23 feet of
proposed Lot 2 is ever removed, the applicant shall dedicate the area
as public right-of-way;
12. Prior to Final Plat approval by the City Council, a subdivision
estimate form shall be submitted for review and approval;
13. Prior to Final Plat approval by the City Council, surety for any
required subdivision improvements that have not been completed shall
be posted and the subdivision inspection fees shall be paid; and,
South Dakota Department of Transportation
Recommendation:
14. Prior to Final Plat approval by the City Council, an Approach
Permit for the Cambell Street access shall be obtained;
Vote: (7
to 0 with Hoffmann, Mashek, Prairie Chicken, Schmidt,
Stone, Wall and Wevik voting yes and none voting no)
|