No. 10PL027 - Eastbrooke Subdivision

A request by Dream Design International, Inc. to consider an application for a Preliminary Plat on Lots 1R and 3, Eastbrooke Subdivision, all located in the SE1/4 of the SW1/4 of Section 31, T2N, R8E, & in the NE1/4 of the NW1/4 of Section 6, T1N, R8E, BHM, Rapid City, Pennington County, South Dakota, legally described as Lots 1 thru 21 and the vacated alley of Block 1 of Brennen & Sweeney Addition of Section 6, T1N, R8E; Lot 1 of Eastbrooke Subdivision, a portion of the S1/2 of the vacated St. Louis Street right-of-way, a portion of the east 10 feet of the vacated Racine Street right-of-way and Tract B of the SE1/4 of the SW1/4, all located in the SE1/4 of the SW1/4 of Section 31, T2N, R8E, and in the NE1/4 of the NW1/4 of Section 6, T1N, R8E, BHM, Rapid City, Pennington County, South Dakota, more generally described as being located north of East Omaha Street between Waterloo Street and LaCrosse Street.


STAFF RECOMMENDATION:

Staff recommends that the Preliminary Plat be continued to the July 19, 2010 City Council meeting as the stipulations have not been met.


PLANNING COMMISSION RECOMMENDATION:
Planning Commission recommended that the Preliminary Plat be approved with the following stipulations:

1.

Prior to Preliminary Plat approval by the City Council, all necessary changes shall be made to the construction plans as identified on the red lined drawings. In addition, the red lined drawings shall be returned to the Growth Management Department;

2.

Prior to Preliminary Plat approval by the City Council, the plat document shall be revised to show a non-access easement along LaCrosse Street or an Exception shall be obtained to allow access from the higher traveled street;

3.

Prior to Preliminary Plat approval by the City Council, the plat document shall be revised to show the dedication of an additional 10 feet of right-of-way along LaCrosse Street or a Variance to the Subdivision Regulations shall be obtained;

4.

Prior to Preliminary Plat approval by the City Council, construction plans shall be submitted for review and approval providing a sewer main along Racine Street or a Variance to the Subdivision Regulations shall be obtained;

5.

Prior to submittal of a Final Plat application, the existing utilities extending through the property shall be removed as proposed or the plat document shall be revised to secure the existing utilities within a utility easement;

6.

Upon submittal of a Final Plat application, surety for any required subdivision improvements that have not been completed shall be posted and the subdivision inspection fees shall be paid;

7.

Prior to the City’s acceptance of the public improvements, warranty surety shall be submitted for review and approval as required; and,

8.

The approved Preliminary Plat for which no grading, construction or other improvements have been initiated within two years of the date of approval of the plat shall be deemed as expired. However, the owner or applicant of the plat may, prior to the termination of the two year period, request a one year extension subject to approval by the City Council. 


VOTE: (7 to 0 with Braun, Brewer, Brown, Gregg, Kinniburgh, Scull and Wyss voting yes and none voting no)