No. 07PL025 - Commerce Park Subdivision

A request by Sperlich Consulting, Inc. for Robert Scull to consider an application for a Preliminary Plat on Lots 1 thru 10 of Block 2 of Commerce Park Subdivision, located in the E1/2 of the SW1/4 of the SE1/4, Section 27, T2N, R7E, BHM, Rapid City, Pennington County, South Dakota, legally described as the NE1/4 of the SW1/4 of the SE1/4, and the N1/2 of the SE1/4 of the SW1/4 of the SE1/4, all in Section 27, T2N, R7E, located in the E1/2 of the SW1/4 of the SE1/4, Section 27, T2N, R7E, BHM, Rapid City, Pennington County, South Dakota, more generally described as being located adjacent to Fountain Plaza Drive between South Plaza Drive and Commerce Road.


PLANNING COMMISSION RECOMMENDATION:
Planning Commission recommended that the Preliminary Plat be approved with the following stipulations:

1.

Prior to Preliminary Plat approval by the City Council, the street construction plans for Sophia Court shall be revised to show the street extending to the east lot line of the subject property. In particular, the construction plans shall show the street located within a 59 foot wide right-of-way and constructed with a minimum 26 foot wide paved surface, curb, gutter, sidewalk, street light conduit, sewer and water or a Variance to the Subdivision Regulations shall be obtained;

2.

Prior to Preliminary Plat approval by the City Council, water system plans demonstrating that adequate fire and domestic flows are being provided shall be submitted for review and approval;

3.

Prior to Preliminary Plat approval by the City Council, construction plans showing the construction of a sewer main along Fountain Plaza Drive located north of the intersection of Sophia Court and Fountain Plaza Drive shall be submitted for review and approval or a Variance to the Subdivision Regulations shall be obtained;

4.

Prior to Preliminary Plat approval by the City Council, all necessary changes shall be made to the construction plans as identified on the red lined drawings. In addition, the red lined drawings shall be returned to the Growth Management Department;

5.

Prior to submittal of a Final Plat application, the plat document shall be revised to show drainage easements as needed;

6.

Prior to submittal of a Final Plat application, the plat document shall be revised to show a 50 foot non-access easement along the corners of Lot 1 and Lot 8 measured from the end of curb radius;

7.

Prior to Preliminary Plat approval by the City Council, a cost estimate of the subdivision improvements shall be submitted for review and approval;

8.

Upon submittal of a Final Plat application, surety for any required subdivision improvements that have not been completed shall be posted and the subdivision inspection fees shall be paid; and,

9.

Prior to the City’s acceptance of the public improvements, a warranty surety shall be submitted for review and approval as required.


VOTE: (8 to 0 with Anderson, Brewer, Brown, Derby, Fast Wolf, Hennies, Runde and Waltman voting yes and none voting no)