No. 06PL151 - Villaggio at Golden Eagle A request by Sperlich Consulting for Signature Development to consider an application for a Preliminary Plat on Lots 1 thru 8 and Lots 12 thru 14, Block 1, the Villaggio at Golden Eagle, formerly a portion of the E1/2 NW1/4 SE1/4, Section 22, T1N, R7E, BHM, Rapid City, Pennington County, South Dakota, legally described as a portion of the E1/2 NW1/4 SE1/4, Section 22, T1N, R7E, BHM, Rapid City, Pennington County, South Dakota, more generally described as being located north and east of the intersection of Catron Boulevard and Golden Eagle Drive. |
PLANNING COMMISSION RECOMMENDATION: |
|
1. |
Prior to Preliminary Plat approval by the City Council, all necessary changes shall be made to the construction plans as identified on the redlined drawings. In addition, the redlined drawings shall be returned to the Growth Management Department; |
2. |
Prior to Preliminary Plat approval by the City Council, a Variance to the Subdivision Regulations shall be obtained to allow a lot twice as long as it is wide or the plat document shall be revised to comply with the length to width requirement; |
3. |
Prior to Preliminary Plat approval by the City Council, a cost estimate of the subdivision improvements shall be submitted for review and approval; |
4. |
Prior to submittal of a Final Plat application, the applicant shall enter into an agreement to abandon the on-site wastewater systems in compliance with the South Dakota Department of Environment and Natural Resources requirements and to connect to the City sewer system when it becomes available within 500 feet of the property; |
5. |
Prior to submittal of a Final Plat application, a note shall be placed on the plat stating that “prior to issuance of a building permit for Lot 5, Block 1, a fire apparatus turnaround in compliance with the International Fire Code shall be provided on Lot 5”; |
6. |
Upon submittal of a Final Plat application, the applicant shall submit a signed waiver of right to protest any future assessment document for the installation of curb, gutter, sidewalk, street light conduit, water, sewer and pavement along Golden Eagle Drive as it abuts the south lot line of Lot 1, Block 2; and, |
7. |
Upon submittal of a Final Plat application, surety for any required subdivision improvements that have not been designed and completed shall be posted and the subdivision inspection fees shall be paid. |
VOTE: (6 to 0 with Anderson, Brown, Gregg, Hennies, Landguth and LeMay voting yes and none voting no) |