No. 06PL075 - Stoney Creek South Subdivision

A request by Stoney Creek Development Corp. for Boschee Engineering to consider an application for a Preliminary Plat on Tract BD, Stoney Creek South Subdivision, and the minor drainage easement located in the unplatted portion of the N1/2 NW1/4 SW1/4, lying south of Catron Boulevard; and a portion of S1/2 NW1/4 SW1/4, less Stoney Creek South Subdivision, all located in Section 22, T1N, R7E, BHM, Rapid City, Pennington County, South Dakota, legally described as the unplatted portion of the N1/2 NW1/4 SW1/4, lying south of Catron Boulevard; and a portion of S1/2 NW1/4 SW1/4, less Stoney Creek South Subdivision, all located in Section 22, T1N, R7E, BHM, Rapid City, Pennington County, South Dakota, more generally described as being located at the southwest corner of the intersection of Bendt Drive and Catron Boulevard.


PLANNING COMMISSION RECOMMENDATION:
Planning Commission recommended that the Preliminary Plat be approved with the following stipulations:

1.

Prior to Preliminary Plat approval by the City Council, all necessary changes shall be made to the construction plans as identified on the red lined drawings. In addition, the red lined drawings shall be returned to the Growth Management Department;

2.

Prior to Preliminary Plat approval by the City Council, all construction plans shall be sealed and signed by a Professional Engineer registered by the State of South Dakota;

3.

Prior to Preliminary Plat approval by the City Council, additional drainage information shall be submitted for review and approval. In particular, drainage flow direction arrows and silt/sedimentation control measures shall be shown on the plans. In addition, drainage information demonstrating that the drainage ditch is sized adequately and that the quantity of riprap at the outlet of the storm drainage is adequate for energy dissipation shall be submitted for review and approval;

4.

Prior to Preliminary Plat approval by the City Council, a cost estimate of the subdivision improvements shall be submitted for review and approval;

5.

Prior to submittal of a Final Plat application, the plat document shall be revised to show non-access easement in compliance with the Street Design Criteria Manual;

6.

Prior to submittal of a Final Plat application, the plat document shall be revised correctly labeling Catron Boulevard and Bendt Drive . In addition, the north arrow shall be aligned to the direction north; and,

7.

Upon submittal of a Final Plat application, surety for any required subdivision improvements that have not been completed shall be posted and the subdivision inspection fees shall be paid.  


VOTE: (9 to 0 with Andrews, Brewer, Brown, Fast Wolf, Landguth, LeMay, Prairie Chicken, Schmidt and Waltman voting yes and none voting no)