No. 05PL006 - Park Meadows Subdivision
A request by Sperlich Consulting, Inc. for Jim Letner to consider an application for a Layout Plat on Lots 1 through 5, Park Meadows Subdivision, located in the SW1/4 of the SW1/4, Section 5, T1N, R8E, BHM, Rapid City, Pennington County, South Dakota, legally described as Lot B of Lot 3 of Tract D located in the SW1/4 of the SW1/4, Section 5, T1N, R8E, BHM, Rapid City, Pennington County, South Dakota, more generally described as being located at 1720 East St. Patrick Street.

PLANNING COMMISSION RECOMMENDATION:
Planning Commission recommended that the Layout Plat be approved with the following stipulations:

1.

Upon submittal of a Preliminary Plat, road construction plans for East Saint Charles Street shall be submitted for review and approval. In particular, the construction plans shall show East Saint Charles Street located in a minimum 59 foot wide right-of-way and constructed with a minimum 26 foot wide paved surface, curb, gutter, sidewalk, street light conduit, water and sewer and bike path if disturbed or a Variance to the Subdivision Regulations shall be obtained;

2.

Upon submittal of a Preliminary Plat, road construction plans for Creek Drive shall be submitted for review and approval. In particular, the road construction plans shall show Creek Drive located in a minimum 100 foot wide right-of-way and constructed with a minimum 40 foot wide paved surface, curb, gutter, sidewalk, street light conduit, water and sewer or a Variance to the Subdivision Regulations shall be obtained;

3.

Upon submittal of a Preliminary Plat, a drainage plan and on-site detention plan for all improved areas shall be submitted for review and approval. In addition, the plat document shall be revised to show additional drainage easements as necessary;

4.

Upon submittal of a Preliminary Plat application, water and sewer plans prepared by a Registered Professional Engineer showing the extension of water service lines and locations along Creek Drive and East Saint Charles Street with size of sewer mains and service lines shall be submitted for review and approval or a Variance to the Subdivision Regulations shall be obtained;

5.

Upon submittal of a Preliminary Plat, a grading plan for all improved areas shall be submitted for review and approval;

6.

Upon submittal of a Preliminary Plat, geotechnical information identifying the soil testing and design calculations for pavement design shall be submitted for review and approval;

7.

Upon submittal of a Preliminary Plat, all necessary changes shall be made to the construction plans as identified on the redlined drawings. In addition, the redlined drawings shall be returned to the Growth Management staff;

8.

Upon submittal of a Preliminary Plat, the plat document shall be revised to provide a minimum 75 foot separation between the proposed driveways and Ash Avenue or a shared approach shall be provided aligning with Ash Avenue or an Exception to the Street Design Criteria Manual shall be obtained;

9.

Upon submittal of a Preliminary Plat, the plat document shall be revised to provide a minimum 230 foot separation between driveway(s) and the East Saint Patrick Street/Creek Drive intersection or an Exception to the Street Design Criteria Manual shall be obtained;

10.

Prior to submittal of a Final Plat, an Approach Permit from the South Dakota Department of Transportation for proposed East Saint Patrick Street accesses to the subject property shall be obtained;

11.

Prior to Preliminary Plat approval by the City Council, a cost estimate of the subdivision improvements shall be submitted for review and approval;

12.

Upon submittal of a Final Plat application, the plat document title shall be revised to identify a different subdivision name;

13.

Upon submittal of a Final Plat application, the plat document shall be revised to show an additional 10 foot of right-of-way dedicated along East Saint Patrick Street and an additional 17 foot of right-of-way dedicated along Creek Drive or a Variance to the Subdivision Regulations shall be obtained;

14.

Upon submittal of a Final Plat application, the plat document shall be revised eliminating the proposed access easements and show shared approaches or construct the access easements per City street standards. In particular, the access easements shall be a minimum 59 foot wide and constructed with a minimum 26 foot wide paved surface, curb, gutter, sidewalk, street light conduit, water and sewer or request a Variance to the Subdivision Regulations;

15.

Upon submittal of a Final Plat application, the plat document shall be revised to include the required Final Plat certificates; and,

16.

Upon submittal of the Final Plat application, surety for any required subdivision improvements that have not been completed shall be posted and the subdivision inspection fees shall be paid.

VOTE: (7 to 0 with Anderson, Andrews, Brown, Hadcock, LeMay, Prairie Chicken and Schmidt all voting yes and none voting no)