PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Layout Plat be approved with
the following stipulations:
1. Upon submittal of the Preliminary
Plat application, the road construction
plans for the extension of Sun Ridge Road shall be submitted for review
and approval. In particular, the road construction plans shall show
the street constructed with a minimum 60 foot right-of-way and a 24
foot paved surface with curb, gutter, sidewalk, street light conduit,
sewer and water or a Variance to the Subdivision Regulations shall
be obtained. In addition, a design showing a minimum 96 foot wide
diameter right-of-way with a minimum 76 foot wide diameter paved cul-de-sac
bulb at the end of the proposed right-of-way shall be submitted for
review and approval;
2. Upon submittal of the Preliminary Plat application, road construction
plans shall be submitted for review and approval for the section of
street that is unnamed located north of Lot 2. In particular, the
road construction plans shall show the street constructed with a minimum
45 foot right-of-way and a 20 foot paved surface with curb, gutter,
sidewalk, street light conduit, sewer and water or a Variance to the
Subdivision Regulations shall be obtained. In addition, a design showing
a minimum 96 foot wide diameter right-of-way with a minimum 76 foot
wide diameter paved cul-de-sac bulb at the end of the proposed right-of-way
shall be submitted for review and approval;
3. Prior to submittal of a Final Plat, the plat document shall include
the dedication of the right-of-way for the east 660 feet of Sun Ridge
Road located directly east of the subject property or an "H"
Lot shall be recorded dedicating the right-of-way or a Variance to
the Subdivision Regulations shall be approved waiving the requirement
to dedicate the right-of-way;
4. A Special Exception is hereby granted to allow 43 lots with one
exclusive point of access in lieu of 40 dwelling units with one point
of access as per the Street Design Criteria Manual;
5. Upon submittal of the Preliminary Plat application, a Special Exception
to allow an approximate 5,700 foot long cul-de-sac without any intermediate
turnarounds in lieu of a maximum 1,200 foot long cul-de-sac with intermediate
turnarounds at intervals not exceeding 600 feet shall be obtained;
6. Prior to Preliminary Plat approval by the City Council, the section
line highway shall be constructed to City Street Design Standards
or a Variance to the Subdivision Regulations shall be obtained to
waive the street improvements or the section line highway shall be
vacated. The adjacent property owner shall participate in the platting
or vacation of the section line highway or a Variance to the Subdivision
Regulations shall be obtained to allow half a right-of-way. In particular,
the road shall be located in a minimum 66 foot wide right-of-way and
constructed with a minimum 24 foot wide paved surface, curb, gutter,
sidewalk, street light conduit, water and sewer or a Variance to the
Subdivision Regulations shall be obtained;
7. Prior to Preliminary Plat approval by the City Council, a Comprehensive
Plan Amendment to the Major Street Plan to relocate the Collector
Street shall be obtained or adjust the preliminary plat to comply
with the Major Street Plan;
8. Upon submittal of the Preliminary Plat application, a drainage
plan shall be submitted for review and approval. In addition, the
plat shall be revised to show drainage easements as needed;
9. Upon submittal of the Preliminary Plat application, water plans
prepared by a Registered Professional Engineer showing the extension
of water lines shall be submitted for review. If a shared well and/or
a community water facility is proposed than it shall be designed as
a public water system or a Variance to the Subdivision Regulations
shall be obtained. In addition, the plat document shall be revised
to show utility easement(s) as needed;
10. Upon submittal of a Preliminary Plat application, sewer plans
prepared by a Registered Professional Engineer showing the extension
of sanitary sewer mains and service lines shall be submitted for review
and approval or a Variance to the Subdivision Regulations shall be
obtained. If individual on-site wastewater systems are proposed, then
an on-site wastewater plan prepared by a Professional Engineer demonstrating
that the soils are suitable for on-site wastewater systems shall be
submitted for review and approval;
11. Upon submittal of the Preliminary Plat application, a topographical
drawing showing any proposed grading and a sediment and erosion control
plan for all improved areas shall be submitted for review and approval;
12. Upon submittal of the Preliminary Plat application, a cost estimate
of the subdivision improvements shall be submitted for review and
approval;
13. Upon submittal of the Preliminary Plat application, all Uniform
Fire Codes shall be continually met;
14. Prior to submittal of a Final Plat application, a Wild Fire Mitigation
Plan shall be submitted for review and approval and the plan shall
be implemented;
15. Prior to submittal of the Final Plat, the property shall be rezoned
to a
zoning district as required to allow a minimum 10 acre lot or a Variance
from the Pennington County Zoning Board of Adjustment shall be obtained;
16. Prior to submittal of the Final Plat, surety for any required
subdivision
improvements that have not been completed shall be posted and the
subdivision inspection fees shall be paid; and,
17. Prior to submittal of the Final Plat, a note shall be placed on
the plat
document stating that "An alternate drainfield area for each
lot shall be identified upon submittal of a building permit."
Vote: (6 to 0 with Brown, Fast
Wolf, Schmidt, Nash, Hadcock and Rodriquez voting yes and none voting
no)
|