Staff
recommends that the Layout and Preliminary Plat be continued to the
May 17, 2004 City Council meeting as the stipulations of approval
have not been met.
PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Layout and Preliminary
Plat be approved with the following stipulations:
1. Prior to Preliminary Plat approval
by the City Council, a revised grading plan shall be submitted for
review and approval;
2. Prior to Preliminary Plat approval by the City Council, a revised
drainage plan shall be submitted for review and approval. In particular,
drainage calculations shall be submitted for review and approval.
The drainage plan shall also be revised to show all channel slopes
4:1 or flatter. Erosion and velocity control shall also be shown and
the storm sewer outlet for Fischer Court shall be adjusted to hit
the bottom of the channel. In addition, the plat shall be revised
to show drainage easement as needed;
3.. Prior to Preliminary Plat approval by the City Council, a geotechnical
report shall be submitted for review and approval;
4. Prior to Preliminary Plat approval by the City Council, a utility
master plan shall be submitted for review and approval. In particular,
the utility master plan shall provide for the extension of utilities
through the subject property as well as to adjacent properties;
5. Prior to Preliminary Plat approval by the City Council, revisions
to the water and sewer plans shall be submitted for review and approval;
6. Prior to Preliminary Plat approval by the City Council, all necessary
changes shall be made to the construction plans as identified on the
redlined drawings. In addition, the red lined drawings shall be returned
to the Engineering Division;
7. Prior to Preliminary Plat approval by the City Council, a subdivision
cost estimate shall be submitted for review and approval;
8. All Uniform Fire Code shall be continually met;
9. Prior to submittal of the Final Plat, the plat document shall be
revised to show non-access easements as per the Street Design Criteria
Manual; and,
10. Upon submittal of the Final Plat, surety for any required subdivision
improvements that have not been completed shall be posted and the
subdivision inspection fees shall be paid.
Vote: (9 to 0 with Brannan, Brown,
Henning, Hoffmann, Nash, Prairie Chicken, Schmidt, Stone and Wevik
voting yes and none voting no)
|