Planning Commission recommended that the Layout
and Preliminary Plat be approved with the following stipulations:
Engineering Division Recommendations:
|
1.
|
Prior to Preliminary Plat approval, additional drainage
information shall be submitted for review and approval demonstrating
that the size of the proposed major drainage easement is adequate.
In addition, the plat document shall be revised to provide additional
drainage easement(s) as needed;
|
2.
|
Prior to Preliminary Plat approval by the City Council,
the construction plans for Sunshine Trail shall be revised to
show Sunshine Trail located in a minimum 49 foot wide right-of-way
with sidewalks on both sides of the street or a Variance to
the Subdivision Regulations shall be obtained. In addition,
construction plans for the west 50 feet of Sunshine Trail shall
be submitted for review and approval. In particular, the plans
shall show Sunshine Trail located in a minimum 49 foot wide
right-of-way with a minimum 24 foot wide paved surface, curb,
gutter, sidewalk, street light conduit, water and sewer or a
Variance to the Subdivision Regulations shall be obtained;
|
3.
|
A Special Exception is hereby granted to allow curb
side sidewalks in lieu of property line sidewalks as per the
Street Design Criteria Manual;
|
4.
|
Prior to Preliminary Plat approval by the City Council,
a subdivision cost estimate shall be submitted for review and
approval;
|
5.
|
Prior to Preliminary Plat approval by the City Council,
a Petition to Vacate Right-of-way shall be signed by the adjacent
property owners for that portion of Sunshine Trail proposed
to be vacated;
|
6.
|
Prior to Preliminary Plat approval by the City Council,
all of the affected utility companies shall submit written documentation
concurring with the proposed Sunshine Trail vacation;
|
7.
|
Prior to Preliminary Plat approval by the City Council,
all necessary changes shall be made to the construction plans
as identified on the redlined drawings. In addition, the red
lined drawings shall be returned to the Engineering Division;
|
8.
|
Prior to submittal of the Final Plat, the plat document
shall be revised to show Sunshine Trail dedicated as “right-of-way”';
|
9.
|
Prior to submittal of the Final Plat, the plat document
shall be revised to show Sheridan Lake Road dedicated this plat
as “right-of-way”;
|
10.
|
Prior to submittal of the Final Plat, the note numbered
“2” on the plat document shall be revised to include “except
where major drainage easements are located”;
|
11.
|
Prior to submittal of the Final Plat, the applicant
shall obtain approval from the City authorizing the H Lot located
along the north side of Sunshine Trail and the H Lot shall be
recorded at the Register of Deed's Office or the plat document
shall be revised to show the dedication of the additional right-of-way;
and,
|
12.
|
Upon submittal of the Final Plat, surety for any required
subdivision improvements that have not been completed shall
be posted and the subdivision inspection fees shall be paid.
|
|
|