Staff
recommends that the Preliminary and Final Plat be continued to the
February 16, 2004 City Council meeting as the stipulations of approval
have not been met.
PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Layout, Preliminary and Final
Plat be approved with the following stipulations:
Engineering Division Recommendations:
1. Prior to Preliminary Plat approval by the City Council, an evaluation
of the increase drainage flows from this phase of the development
shall be submitted for review and approval. In addition, necessary
mitigation measures shall be identified;
2. Prior to Preliminary Plat approval by the City Council, the applicant
shall demonstrate that all flows from the area within the development
and from the basins above the development are being routed within
their natural drainage basins, or the applicant shall demonstrate
the right to divert drainage into another drainage basin;
3. Prior to Preliminary Plat approval by the City Council, a utility
master plan shall be submitted for review and approval. In particular,
the utility master plan shall demonstrate that utility services, especially
sanitary sewer services, can be provided to the adjacent upstream
area.
4. Prior to Preliminary Plat approval by the City Council, the applicant
shall demonstrate that all agreements necessary to assure wastewater
connection fees for upgrades, improvements or replacement to the sanitary
sewer lift station serving this area, are in effect and that the appropriate
fees shall be paid;
5. Prior to Preliminary Plat approval by the City Council, road construction
plans shall be submitted for review and approval showing curb, gutter
and sidewalk along Haines Avenue or a Variance to the Subdivision
Regulations shall be obtained;
6. Prior to Preliminary Plat approval by the City Council, all necessary
changes shall be made to the construction plans as identified on the
red lined drawings. In addition, the red lined drawings shall be returned
to the Engineering Division;
7. Prior to Preliminary Plat approval by the City Council, a subdivision
cost estimate form shall be submitted for review and approval;
8. Prior to Final Plat approval by the City Council, the plat document
shall be revised to provide non-access easements in compliance with
the Street Design Criteria Manual;
Emergency Services Communication
Center Recommendation:
9. Prior to Final Plat approval by the City Council, alternate road
names for "Amber Drive" and "Gemstone Place" shall
be submitted for review and approval. In addition, the plat document
shall be revised to show the approved road names;
Pennington County Highway Department
Recommendation:
10. Prior to Preliminary Plat approval by the City Council, an approach
permit shall be obtained for the connection of Amber Drive to Haines
Avenue; and,
Urban Planning Division Recommendations:
11. Prior to City Council approval, surety for any required subdivision
improvements that have not been completed shall be posted and the
subdivision inspection fee shall be paid.
VOTE: (6 to 0 with Brannan, Brown, Fast Wolf,
Hoffmann, Prairie Chicken and Schmidt voting yes and none voting no)
|