PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Layout Plat be approved
with the following stipulations:
Engineering
Division Recommendations:
1. Upon submittal of the Preliminary Plat, the plat document shall
be revised to provide ten additional feet of right-of-way along Plateau
Lane;
2. Upon submittal of the Preliminary Plat, road construction plans
for Plateau Lane shall be provided. In particular, the road construction
plans shall show Plateau Lane with a 27 foot wide paved surface, curb,
gutter and sidewalk or a Variance to the Subdivision Regulations shall
be obtained;
3. Upon submittal of the Preliminary Plat, the plat document shall
identify all easements. In particular, the 30 foot wide sanitary and
sewer easement and the five foot wide Hawthorn Irrigation Ditch easement
located along the south lot line shall be identified. In addition
all utility and drainage easement(s) shall be identified;
4. Prior to Preliminary Plat approval by the City Council, a subdivision
estimate form shall be submitted for review and approval;
Register
of Deed's Office Recommendation:
5. Upon submittal of the Preliminary Plat, a plat document showing
a title and road name(s) shall be submitted for review and approval;
Pennington
County Planning Department Recommendation:
6. Upon submittal of the Preliminary Plat, a structural site plan
shall be submitted for review and approval;
7. Prior to Preliminary Plat approval by the City Council, a Variance
shall be obtained from the Pennington County Board of Adjustment to
reduce the minimum required 25 foot front yard setback if required
as determined by the structural site plan;
Urban
Planning Division Recommendations:
8. Prior to Final Plat approval by the City Council, surety for any
required subdivision improvements that have not been completed shall
be posted and the subdivision inspection fees shall be paid.
Vote: (6 to 0 with Brown, Fast Wolf,
Prairie Chicken, Schmidt, Stone and Wevik voting yes and none voting
no)
|