PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Final Plat be approved
with the following stipulations:
Engineering
Division Recommendations:
1. Prior to Final Plat approval by the City Council, all necessary
changes shall be made to the construction plans as identified on the
red lined drawings. In addition, the red lined drawings shall be returned
to the Engineering Division;
2. Prior to Final Plat approval by the City Council, a cost estimate
shall be submitted for review and approval;
3. Prior to Final Plat approval by the City Council, the plat document
shall be revised to show a 20 foot wide major drainage easement along
the north lot line of Lots 31-35;
4. Prior to Final Plat approval by the City Council, the plat document
shall be revised to show a ten foot wide major utility easement along
the west lot line of Lot 36. In addition, the following note shall
be placed on the plat: "Any major utility or drainage easement
shown hereon shall be kept free of all obstructions including but
not limited to buildings, walls, fences, hedges, trees, and shrubs.
These easements grant to all public authorities the right to construct,
operate, maintain, inspect and repair such improvements and structures
as it deems expedient to facilitate operation of the improvements";
and,
Urban
Planning Division Recommendations:
5. Prior to Final Plat approval by the City Council, surety for any
required subdivision improvements that have not been completed shall
be posted and the subdivision inspection fees shall be paid. (8 to
0 with Brennan, Brown, Fast Wolf, Hoffmann, Mickelson, Schmidt, Stone
and Wevik voting yes and none voting no)
Vote: (8 to 0 with Brannan, Brown,
Fast Wolf, Hoffmann, Mickelson, Schmidt, Stone and Wevik voting yes
and none voting no)
|