No. 03PL072 - Lazy P-6 Subdivision
A request by Centerline, Inc. for Lazy P-6 Properties, LLC to consider an application for a Layout Plat on Lots 1 of Block 1, Lazy P-6 Subdivision, Section 19, T1N, R8E, BHM, Rapid City, Pennington County, South Dakota, legally described as NW1/4 NW1/4 NW1/4 of Section 19, T1N, R8E, BHM, Rapid City, Pennington County, South Dakota, more generally described as being located in the southeast quadrant of the current Parkview Drive terminus.

PLANNING COMMISSION RECOMMENDATION:
Planning Commission recommended that the Layout Plat be approved with the following stipulations:

Engineering Division Recommendations:
1. Upon submittal of a Preliminary Plat, a grading plan and geotechnical information shall be submitted for review and approval;
2. Upon submittal of a Preliminary Plat, a field topographic survey shall be submitted for review and approval;
3. Upon submittal of a Preliminary Plat, a drainage plan shall be submitted for review and approval. In particular, any off-site interim detention improvements to be located on the balance of the applicant's property as shown on the Master Plan shall be identified. In addition, the plat shall be revised to show drainage easements as needed;
4. Upon submittal of a Preliminary Plat, sewer plans prepared by a Registered Professional Engineer showing the extension of sanitary sewer mains and service lines shall be submitted for review and approval. In addition, the applicant shall delineate the proposed service boundaries for the sewer extension;
5. Upon submittal of the Preliminary Plat, water plans prepared by a Registered Professional Engineer showing the extension of water mains shall be submitted for review and approval. In addition, the applicant shall delineate the proposed service boundaries for the water extension;
6. Upon submittal of the Preliminary Plat, complete engineering plans as specified in Section 16.20.040 of the Rapid City Municipal Code shall be submitted for review and approval. In particular, complete street design plans shall be submitted showing the location of utilities, storm drainage, curb and gutter and sidewalk improvements for all adjacent and interior roadways. In addition, the construction plans shall show a temporary turnaround at the eastern terminus of the Local Road located south of the subject property and at the intersection of the Local Road and Parkview Drive;
7. Upon submittal of the Preliminary Plat, the plat document shall be revised to show the dedication of the west half of the rights-of-way for Parkview Drive and Fifth Street located on an adjacent property(s) or the west half of the rights-of-way shall be dedicated as a part of a separate platting proposal. Either way, the entire rights-of-way for Parkview Drive and Fifth Street shall be dedicated at the same time or a Variance to the Subdivision Regulations shall be obtained to allow platting half a right-of-way;
8. Upon submittal of the Preliminary Plat, road construction plans showing the proposed road to be located along the south lot line of the subject property as a local street shall be submitted for review and approval. In addition, the road construction plans shall show a temporary turnaround at the eastern terminus of the local street and at the intersection of the local street and Parkview Drive;
9. Prior to Preliminary Plat approval by the City Council, the section line highway located along the north lot line shall be improved to City Street Design standards or a Variance to the Subdivision Regulations shall be obtained to waive the street improvements or the section line highway shall be vacated;
10. Prior to Final Plat approval by the City Council, the plat document shall be revised to provide an additional five feet of right-of-way for the section line highway located along the north lot line or a Variance to the Subdivision Regulations shall be obtained. In addition, the plat document shall be revised to show the dedication of the north half of the right-of-way for the section line highway located on an adjacent property or the north half of the right-of-way shall be dedicated as a part of a separate platting proposal. Either way, the entire right-of-way for the section line highway shall be dedicated at the same time or a Variance to the Subdivision Regulations shall be obtained to allow platting half a right-of-way;
11. Prior to Final Plat approval by the City Council, a non-access easement shall be shown along the perimeter of Lot 1, Block 1 except for approved approach locations. In particular, access shall be taken from the lesser order street or a Special Exception to the Street Design Criteria Manual shall be obtained;
12. Upon submittal of the Preliminary Plat, a phasing schedule for the balance of the Master Plan shall be submitted for review and approval. In addition, the Master Plan shall be revised to show access to all lots located within the Low Density Residential II District. The Master Plan shall also provide a road connection to the property located north of the subject property;
13. The Special Exception to allow more than 40 dwelling units with one point of access is hereby denied;

Fire Department Recommendations:
14. Upon submittal of the Preliminary Plat, a fire hydrant design plan showing the location of fire hydrants and water lines, including the size of the proposed water lines, shall be submitted for review and approval

Emergency Services Communication Center Recommendation:
15. Upon submittal of the Preliminary Plat, a plat document showing road names shall be submitted for review and approval;

South Dakota Department of Transportation Recommendation:
16. Prior to Final Plat approval by the City Council, an approach permit for the Fifth Street approach onto Catron Boulevard must be obtained;

Urban Planning Division Recommendations:
17. Prior to Final Plat approval by the City Council, a subdivision estimate form shall be submitted for review and approval; and,
18. Prior to Final Plat approval by the City Council, surety for any required subdivision improvements that have not been completed shall be posted and the subdivision inspection fees shall be paid.

Vote: (6 to 0 with Fast Wolf, Hoffmann, Mickelson, Prairie Chicken, Schmidt and Stone voting yes and none voting no)