Staff
recommends that the Preliminary and Final Plat be continued to the
April 21, 2003 City Council meeting as the stipulations of approval
have not been met.
PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Preliminary and Final
Plat be approved with the following stipulations:
Engineering Division Recommendations:
1. Prior to Preliminary Plat approval
by the City Council, road construction plans for the cul-de-sac at
the end of Holiday Lane shall be submitted for review and approval
or a Variance to the Subdivision Regulations shall be obtained. In
particular, the construction plans shall show the extension of water,
sewer, street light conduit, curb, gutter, sidewalk and pavement;
2. A Special Exception to waive the requirement to dedicate right-of-way
for the Holiday Lane cul-de-sac is hereby granted with the stipulation
that upon approval of an Initial and Final Planned Residential Development,
right-of-way for the cul-de-sac or possible road extension be dedicated;
3. Prior to Preliminary Plat approval by the City Council, construction
plans for Estates Drive and Foothills Drive providing a minimum 49
foot wide right-of-way with a 24 foot wide paved surface, curb, gutter,
sidewalk, street light conduit, sewer and water shall be submitted
for review and approval or a Variance to the Subdivision Regulations
shall be obtained;
Urban Planning Division Recommendations:
4. Prior to Final Plat approval by the City Council, a subdivision
estimate form shall be submitted for review and approval; and,
5. Prior to Final Plat approval by the City Council, surety for any
required subdivision improvements that have not been completed shall
be posted and the subdivision inspection fees shall be paid.
Vote: (7 to 0 with Hoffmann, Mashek,
Prairie Chicken, Schmidt, Swedlund Stone and Wall voting yes and none
voting no)
|