PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended
that the Layout Plat be approved with the following
stipulations:
Engineering Division Recommendations:
1. Upon submittal of a Preliminary Plat, a complete grading plan shall
be submitted for review and approval;
2. Upon submittal of a Preliminary Plat, a drainage plan shall be
submitted for review and approval. In addition, the plat shall be
revised to show drainage easements as needed;
3. Upon submittal of a Preliminary Plat, sewer plans prepared by a
Registered Professional Engineer showing the extension of sanitary
sewer mains and service lines shall be submitted for review and approval.
In addition, the sewer line to be located along the rear of the proposed
commercial lots shall be a private utility and shall be maintained
by the applicant;
4. Upon submittal of a Preliminary Plat, water plans prepared by a
Registered Professional Engineer showing the extension of water mains
shall be submitted for review and approval;
5. Upon submittal of the Preliminary Plat, complete engineering plans
as specified in Section 16.20.040 of the Rapid City Municipal Code
shall be submitted for review and approval. In particular, complete
street design plans shall be submitted showing the location of utilities,
storm drainage, curb and gutter and sidewalk improvements for all
adjacent and interior roadways;
6. Upon submittal of the Preliminary Plat, the plat document shall
be revised to show a non-access easement along the first 100 feet
of Bendt Drive;
7. Upon submittal of the Preliminary Plat, construction plans for
Sheridan Lake Road and Catron Boulevard shall be submitted for review
and approval. In particular, the construction plans shall show a deceleration
lane along Sheridan Lake Road. In addition, a non-access easement
shall be shown along Sheridan Lake Road and Catron Boulevard except
for approved approach location(s);
8. Upon submittal of the Preliminary Plat, construction plans for
Bendt Drive shall be submitted for review and approval. In particular,
Bendt Drive shall be constructed with a 59 foot wide right-of-way.
The first 100 feet of Bendt Drive shall be constructed with 3-12 foot
wide paved lanes transitioning into a 27 foot wide paved surface;
9. Upon submittal of the Preliminary Plat, the plat document shall
be revised to eliminate the shared approach to proposed Lots 1 and
7 located along Catron Boulevard;
10. Upon submittal of the Preliminary Plat, the construction plans
shall be revised to provide a bike path extending west from Bendt
Drive to Sheridan Lake Road;
11. Upon Preliminary Plat submittal, the construction plans shall
be revised to provide an intermediate turnaround every 600 feet along
Bendt Drive or a Special Exception to the Street Design Criteria Manual
shall be obtained;
Fire Department Recommendation:
12. Upon submittal of the Preliminary Plat, a fire hydrant design
plan showing the location of fire hydrants and water lines, including
the size of the proposed water lines, shall be submitted for review
and approval;
13. All Uniform Fire Code shall be continually met;
Register of Deed-s Office Recommendation:
14. Prior to Final Plat approval, the plat title shall be revised
changing the name of the proposed subdivision from "Stoney Creek
Southside Subdivision" to Stoney Creek South Subdivision;
Urban Planning Division Recommendations:
15. Prior to Final Plat approval by the City Council, a subdivision
estimate form shall be submitted for review and approval; and,
16. Prior to Final Plat approval by the City Council, surety for any
required subdivision improvements that have not been completed shall
be posted and the subdivision inspection fees shall be paid.
VOTE: (9 to 0 with Fast Wolf, Hoffmann,
Mashek, Mickelson, Prairie Chicken, Schmidt, Stone, Wall and Wevik
voting yes and none voting no)
|