PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Preliminary and Final Plat
be approved with the following stipulations:
Engineering
Division Recommendations:
1. Prior to Preliminary Plat approval by the City Council, the design
plans shall be revised in accordance with the red line comments;
2. Prior to Final Plat approval by the City Council, the applicant
shall provide documentation of a sanitary sewer easement crossing
Lot 6 of Grimm Addition for a sanitary sewer main serving Lot 3 of
Grimm Addition;
3. Prior to Final Plat approval by the City Council, the plat shall
be revised to include a non-access easement along the entire Creek
Drive frontage and along the Viewfield Avenue frontage for a distance
of 50 feet from the intersection of Creek Dive and Viewfield Avenue;
Fire Department Recommendations:
4. That all requirements of the Uniform Fire Code shall be continually
met;
5. Prior to the start of any building construction, fire hydrants
shall be installed and operational;
6. Prior to the start of any building construction, all weather access
roads shall be constructed to the building sites. Dead-end access
roads in excess of 150 feet in length shall include the provision
of a cul-de-sac or turn-around area that complies with all requirements
of the Uniform Fire Code and the Rapid City Street Design Criteria
Manual;
7. Prior to the start of any building construction, street signs shall
be posted. The street signs may be constructed of temporary material
initially. Prior to issuance of a Certificate of Occupancy, permanent
street signs shall be posted;
8. Prior to issuance of a Certificate of Occupancy, the facility(s)
addresses shall be posted. Said numbers shall be a minimum of seven
inches in height and displayed on a contrasting background;
9. Prior to issuance of a Certificate of Occupancy, the facility(s)
addresses shall be posted. Said numbers shall be a minimum of seven
inches in height and displayed on a contrasting background;
Pennington County
Register of Deeds Recommendation:
10. Prior to Final Plat approval by the City Council, the applicant
shall revise the plat to include "in Grimm Addition" to
the formerly statement;
Air Quality Division Recommendations:
11. An Air Quality Construction Permit shall be obtained if more than
one acre of surface area is disturbed prior to the issuance of any
building permits or grading permits;
Urban Planning
Division Recommendations:
12. Prior to Preliminary Plat approval by the City Council, subdivision
improvement estimates shall be provided for review and approval;
13. Prior to Final Plat approval by the City Council, the subdivision
inspection fees shall be paid; and,
14. Prior to Final Plat approval by the City Council, the applicant
shall post surety for the required improvements along the west 115
feet of Viewfield Avenue that have not been completed. For the balance
of the Viewfield Avenue frontage subdivision improvements, the applicant
shall either enter into an agreement with the City to pay now for
the required improvements which the City will install at a later date
or post a separate surety bond.
Vote: (10 to 0 with Fast Wolf, Hoffmann,
Mashek, Mickelson, Prairie Chicken, Schmidt, Stone, Swedlund, Wall
and Wevik voting yes and none voting no)
|