Staff
recommends that the Preliminary and Final Plat be continued to the
March 3, 2003 City Council meeting as the stipulations of approval
have not been met.
PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Preliminary and Final
Plat be approved with the following stipulations:
Engineering
Division Recommendations:
1. Prior to Preliminary Plat approval by the City Council, water plans
showing the design of the proposed community water system shall be
submitted for review and approval. In addition, the design of the
proposed community water system shall demonstrate that domestic flow
requirement(s) are being met;
2. Prior to Preliminary Plat approval by the City Council, a water
permit shall be obtained from the South Dakota Department of Environment
and Natural Resources to allow the well to serve the proposed development;
3. Prior to Preliminary Plat approval by the City Council, a homeowners
agreement shall be submitted for review and approval demonstrating
maintenance of the community well until such time as City water is
available to the property. In addition, the applicant shall enter
into an agreement with the City stating that the property owner(s)
shall install fire hydrants as required upon connecting to City water;
4. Prior to Preliminary Plat approval by the City Council, the revised
sewer plans showing sanitary sewer service location(s) shall be submitted
for review and approval;
5. Prior to Final Plat approval by the City Council, the plat shall
be revised to show a non-access easement along Cliff Drive and the
first fifty feet of Miracle Place;
6. Prior to Preliminary Plat approval by the City Council, a complete
grading plan shall be submitted for review and approval. In addition,
a drainage study incorporating hydrology and hydraulic calculations
demonstrating that the drainage channel has been designed correctly
shall be submitted for review and approval. Sediment controls shall
also be shown;
7. Prior to Preliminary Plat approval by the City Council, all affected
utilities shall concur with the proposed section line highway vacation
or road construction plans for the section line highway shall be submitted
for review and approval or a Variance to the Subdivision Regulations
shall be obtained waiving the requirement to improve the section line
highway;
8. Prior to Preliminary Plat approval by the City Council, all necessary
changes shall be made to the construction plans as identified on the
red lined drawings. In addition, the red lined drawings shall be returned
to the Engineering Division;
Fire Department Recommendations:
9. Prior to Preliminary Plat approval by the City Council, the applicant
shall submit a Wild Land Fire Mitigation Plan for review and approval.
In addition, the Wild Land Fire Mitigation Plan shall be implemented
prior to Final Plat approval by the City Council;
10. A Special Exception is hereby granted to reduce the right-of-way
width of the hammerhead turnaround located at the terminus of Miracle
Place from 40 feet to 30 feet;
Emergency Services Communication Center Recommendation:
11. Prior to Final Plat approval by the City Council, a road name
change shall be approved to change the road name of "Miracle
Place". The proposed road name shall be reviewed and approved
by the Emergency Services Communication Center and, subsequently,
approved by the City Council;
Register
of Deed's Office Recommendation:
12. Prior to Final Plat approval by the City Council, the plat document
shall be revised to show the heading as "Lots A, B and C of Miracle
Place Subdivision" or "Lots A, B, C of Lot 3, Block 15 of
Canyon Lake Heights Subdivision";
Urban
Planning Division Recommendations:
13. Prior to Preliminary Plat approval by the City Council, the plat
document shall be revised to show the location of the well outside
of the minimum required setbacks or a Variance to the Zoning Ordinance
must be obtained.
14. Prior to Final Plat approval by the City Council, a subdivision
estimate form shall be submitted for review and approval; and,
15. Prior to Final Plat approval by the City Council, surety for any
required subdivision improvements that have not been completed shall
be posted and the subdivision inspection fees shall be paid.
Vote: (9
to 0 with Fast Wolf, Hoffmann,
Mashek, Mickelson, Prairie Chicken, Schmidt, Stone, Wall and Wevik
voting yes and none voting no)
|