PLANNING
COMMISSION RECOMMENDATION:
Planning
Commission recommended that the Layout Plat be approved with the following
stipulations:
Engineering Recommendations:
1. Upon Preliminary Plat submittal, a conceptual drainage plan shall
be submitted demonstrating that physical and legal concerns resulting
from the proposed increased developmental density are being addressed.
Additionally, a storm water plan shall be submitted identifying potential
impacts downstream. The plan shall identify on-site storm water detention
if needed;
2. Prior to Final Plat approval by the City Council, the applicant
shall submit a well maintenance agreement for review and approval,
to be filed with the Final Plat;
3. Prior to Preliminary Plat approval by the City Council, the applicant
shall submit for review and approval soil profile and percolation
data collected within five feet of the proposed drainfield area for
Lot A;
4. Prior to Preliminary Plat approval by the City Council, the applicant
shall submit plans prepared by a registered professional engineer
for a septic tank wastewater disposal system;
5. Upon Preliminary Plat submittal, the applicant shall submit information
demonstrating how the existing septic tank disposal system may be
brought into compliance with State separation requirements;
6. Prior to Preliminary Plat approval by the City Council, the applicant
shall submit information identifying well location(s) and septic tank
and drainfield location(s) on Lot 6 to the north of the subject property;
7. Upon Preliminary Plat submittal, the applicant shall submit documentation
verifying the depth of the well;
8. Prior to Preliminary Plat approval by the City Council, the applicant
shall submit information which demonstrates that flow from the existing
well is adequate for domestic use and shall provide flows required
for fire protection;
9. Prior to Preliminary Plat approval by the City Council, the applicant
shall demonstrate that access to the proposed lots meet the requirements
of the Street Design Criteria Manual;
Fire Department Recommendations:
10. Prior to Preliminary Plat approval by the City Council, the applicant
shall provide a Wildland Fuels Mitigation Plan for review and approval
by the Rapid City Fire Department;
11. Prior to Preliminary Plat approval by the City Council, the applicant
shall submit plans for a water line, fire hydrant(s), and vehicle
turn-around servicing proposed Lot A meeting Uniform Fire Code requirements;
12. Prior to Preliminary Plat approval by the City Council, the applicant
shall demonstrate that ingress/egress to the proposed lots meets the
requirements of the Uniform Fire Code;
13. Prior to Final Plat approval by the City Council, the applicant
shall post street signs identifying addresses of each proposed lot
to be approved by the Fire Department;
14. Prior to Final Plat approval by the City Council, the applicant
shall demonstrate that the access grade to the proposed lots does
not exceed 12 percent, and that driveway grades do not exceed 16 percent,
or a note shall be placed on the plat stating, "Buildings on
any lots having driveways exceeding 16% slope shall be equipped with
an automated residential sprinkler system subject to approval by the
Rapid City Fire Department";
Urban Planning Division Recommendations:
15. Prior to Preliminary Plat approval by the City Council, complete
engineering plans as specified in Section 16.20.040 of the Rapid City
Municipal Code shall be submitted for review and approval. Complete
street design plans identifying the location of utilities, storm drainage,
curb and gutter, dry sewer, water, street light conduit and sidewalk
improvements for all adjacent and interior roadways or a Variance
to the Subdivision Regulations shall be obtained;
16. Prior to Final Plat approval by the City Council, a subdivision
estimate form shall be submitted for review and approval;
17. Prior to Final Plat approval by the City Council, improvements
to the section line highway shall be completed, a Variance to the
Subdivision Regulations shall be obtained to waive the requirements,
or the section line highway shall be vacated; and
18. Prior to Final Plat approval by the City Council, surety for any
required subdivision improvements that have not been completed shall
be posted and the subdivision inspection fee shall be paid.
Vote: (7 to 0 with Hoffmann, Mashek,
Prairie Chicken, Schmidt, Swedlund Stone and Wall voting yes and none
voting no)
|