Prior to Preliminary Plat approval by the |
||||||||
2. |
No further platting shall be allowed beyond this phase
without a water connection to the Terracita Water Zone being completed; |
||||||||
3. |
Prior to Preliminary Plat approval by the |
||||||||
4. |
Prior to Final Plat approval by the City Council,
a note shall be placed on the plat stating that a Professional Engineer
shall design each individual on-site wastewater system. In addition, the note shall indicate that
a Certificate of Completion shall be signed by the same Professional
Engineer upon construction of the on-site wastewater system; |
||||||||
5. |
Upon availability of City sewer services, the property
owner must connect to City sewer within six months and abandon the septic
tank per State Regulations; |
||||||||
6. |
Prior to Preliminary Plat approval by the City Council,
revisions to the recently submitted Master Plan for the water, sewer
and street(s) shall be submitted for review and approval; |
||||||||
7. |
Prior to Preliminary Plat approval by the |
||||||||
8. |
Prior to Preliminary Plat approval by the |
||||||||
9. |
Prior to Preliminary Plat approval by the City Council,
the plat shall be revised to show additional utility and drainage easement(s)
as needed; |
||||||||
10. |
Prior to Preliminary Plat approval by the City Council,
all necessary changes shall be made to the construction plans as identified
on the red lined drawings. In
addition, the red lined drawings shall be returned to the Engineering
Division; |
||||||||
11. |
Prior to City Council approval of the Final Plat,
the plat shall be revised to show a non-access easement along |
||||||||
12. |
Design Plans for all improvements, including off-site
improvements, and any required revisions as identified by the Engineering
Division shall be submitted for review and approval a minimum of ten
working days prior to City Council approval of the Preliminary Plat; |
||||||||
Fire Department Recommendation: |
|||||||||
13. |
The Uniform Fire Code shall be continually met; |
||||||||
South Dakota Department of Transportation
Recommendation: |
|||||||||
14. |
Prior to Final Plat approval by the City Council, the applicant
shall sign a cost sharing agreement for the construction of an east
bound left turn lane along Catron Boulevard if and when deemed necessary
by the South Dakota Department of Transportation; |
||||||||
|
|||||||||
15. |
Prior to Final Plat approval by the City Council, an alternate
road name for “ |
||||||||
Register of Deed’s Office Recommendation: |
|||||||||
16. |
Prior to Final Plat approval by the City Council, the plat
title shall be revised to include “Estates” in the lot and block description: |
||||||||
Urban Planning Division Recommendations: |
|||||||||
17. |
Prior to Preliminary Plat approval by the |
||||||||
18. |
Prior to Final Plat approval by the City Council, the property
shall be rezoned to Low Density Residential District with a Planned
Development Designation; |
||||||||
19. |
Prior to Final Plat approval by the City Council, a Variance
to the Subdivision Regulations shall be obtained to allow a lot length
greater than twice the lot width or the plat shall be revised to comply
with the length to width requirement. |
||||||||
20. |
Prior to Preliminary Plat approval by the City Council, a
subdivision estimate form for the uncompleted subdivision improvements
shall be submitted for review and approval; and, |
||||||||
21. |
Prior to Final Plat approval by the City Council, surety for the uncompleted improvements shall be posted and the subdivision inspection fees shall be paid. | ||||||||
VOTE: |
(7 to 0 with Fast Wolf, Hoffmann, Mashek, Prairie Chicken, Stone, Wall, and Wevik voting yes and none voting no. |