PLANNING
COMMISSION RECOMMENDATION:
Planning Commission recommended that the Layout Plat be approved with
the following stipulations:
Engineering Division Recommendations:
1. Upon Preliminary Plat submittal, geotechnical analysis for pavement
design(s) shall be submitted for review and approval;
2. Upon Preliminary Plat submittal, a sediment and erosion control
plan shall be submitted for review and approval;
3. Upon Preliminary Plat submittal, a drainage plan shall be submitted
for review and approval. In addition, the plat shall be revised to
show drainage easements as needed;
4. Prior to Preliminary Plat approval, a National Pollutant Discharge
Elimination System Permit shall be obtained in order to allow storm
water discharge from the construction site;
5. Upon Preliminary Plat submittal, an electrical/private utility
service plan shall be submitted for review and approval to insure
that there are no conflicts with the drainage plan;
6. Upon Preliminary Plat submittal, sewer plans prepared by a Registered
Professional Engineer showing the extension of sanitary sewer mains
and service lines shall be submitted for review and approval;
7. Upon Preliminary Plat submittal, water plans prepared by a Registered
Professional Engineer showing the extension of water mains shall be
submitted for review and approval;
8. Upon Preliminary Plat submittal, complete engineering plans as
specified in Section 16.20.040 of the Rapid City Municipal Code shall
be submitted for review and approval. In particular, complete design
plans showing utilities, storm drainage, curb and gutter, sidewalk
and sewer and water lines shall be submitted for review and approval;
9. Upon Preliminary Plat submittal, the plat document shall be revised
to provide a road connection to the south. In particular, the road
shall align with Craig Street located south of Fairmont Boulevard
and meet geometric requirements as specified by the Street Design
Criteria Manual;
10. Upon Preliminary Plat submittal, a wetland mitigation plan shall
be submitted for review an approval. In addition, a 404 Permit shall
be obtained from the United States Corp of Engineers prior to work
and/or disturbance of any wetland(s) located on the property;
11. Upon Preliminary Plat submittal, a non-access easement shall be
shown along the first 175 feet of East Oakland Street as it extends
west from Cambell Street;
12. Prior to Final Plat approval by the City Council, the adjacent
property owner shall sign the plat document for that portion of East
Oakland Street to be located on the property or the right-of-way shall
be dedicated as an H Lot;
Fire Department Recommendation:
13. Upon Preliminary Plat submittal, a fire hydrant design plan showing
the location of fire hydrants and water lines, including the size
of the proposed water lines, shall be submitted for review and approval;
South Dakota Department of Transportation
Recommendation:
14. Prior to Preliminary Plat approval by the City Council, an approach
permit shall be obtained for the proposed approach location along
Cambell Street;
Urban Planning Division Recommendations:
15. Prior to Final Plat approval by the City Council, a subdivision
estimate form shall be submitted for review and approval; and
16. Prior to Final Plat approval by the City Council, surety for any
subdivision improvements that have not been completed shall be posted
and the subdivision inspection fee shall be paid.
VOTE: (10 to 0 with Fast Wolf,
Hoffmann, Mashek, Mickelson, Prairie Chicken, Schmidt, Stone, Swedlund,
Wall and Wevik voting yes and none voting no)
|