Aerial Photograph |
No. 02PL058
- Tower Ridge Staff recommends that the Final Plat be continued to the August 19, 2002 City Council meeting as the stipulations of approval have not been met. PLANNING COMMISSION RECOMMENDATION: Engineering Division Recommendations: |
|||||||||||
1. |
Construction plans for all improvements,
including off-site improvements, and any required revisions as identified
by the Engineering Division shall be submitted by the applicant and
approved by the Engineering Division prior to start of any construction
or grading; |
||||||||||
2. |
The applicant shall obtain approval
of construction plans for any necessary improvements along U.S. Highway
16 from the South Dakota Department of Transportation prior to Engineering
Division’s approval of the plans; |
||||||||||
3. |
Construction plans for the half-bulb
intermediate turnaround on |
||||||||||
4. |
Construction plans shall be revised to provide property line sidewalks,
or an Exception to the Street Design Criteria Manual shall be obtained
for property line sidewalks in lieu of curb side sidewalks; |
||||||||||
5. |
The applicant shall obtain a vacation of right-of-way petition from all
affected property owners and utility companies for the proposed vacation
of right-of-way prior to Final Plat approval by the City Council; |
||||||||||
6. |
An access easement to the remainder of existing |
||||||||||
7. |
Prior to Preliminary Plat approval by the Planning Commission for subsequent
phases of the development, the applicant shall obtain the Engineering
Division’s approval of the water and sewer utility master plan; |
||||||||||
8. |
The applicant shall obtain a permit to occupy the right-of-way from the
South Dakota Department of Transportation for proposed water and sewer
lines prior to Engineering Division’s approval of the plans; |
||||||||||
9. |
Prior to obtaining a building permit, a drainage plan must be submitted
and approved for each lot. The drainage plan(s) shall include conveyance
system(s) down the entire length of the slopes and shall provide for
erosion and sediment control; and, |
||||||||||
10. |
Prior to Preliminary Plat approval
by the Planning Commission for subsequent phases of the development,
the applicant shall obtain the Engineering Division’s approval of
a revision to the drainage plan which identifies the phase of development
with which the future detention pond will be constructed. |
||||||||||
Urban Planning Division Recommendations: |
|||||||||||
11. |
Prior to Preliminary Plat approval
by the City Council, a structural site plan shall be submitted for
review and approval; |
||||||||||
12. |
Prior to Final Plat approval by the
City Council, a subdivision estimate form shall be submitted for review
and approval; |
||||||||||
13. |
Prior to Final Plat approval by the
City Council, surety for any required subdivision improvements that
have not been completed shall be posted and the subdivision inspection
fees shall be paid; |
||||||||||
Register of Deed's Office Recommendation: |
|||||||||||
14. |
Prior to Final Plat approval by the
City Council, a plat shall be revised to show a plat title including
the block and lots. In addition,
the name “Tower Ridge Subdivision, cannot be utilized; and, |
||||||||||
Fire Department Recommendation: |
|||||||||||
15. |
All Uniform Fire Codes shall be continually
met. |
||||||||||
VOTE: (7 to 0) |