PLANNING COMMISSION RECOMMENDATION:
Staff recommends that the Preliminary and Final Plat be approved with
the following stipulations:
Engineering
Division Recommendations:
1. Prior to Preliminary Plat approval by the Planning Commission,
complete engineering plans and related information as specified in
Section 16.20.040 of the Rapid City Municipal Code shall be submitted
for review;
2. Prior to Preliminary Plat approval by the City Council, the applicant
shall submit a sanitary sewer master plan for all phases of the subdivision;
3. Prior to Preliminary Plat approval by the City Council, a complete
grading plan including provisions for lot line drainage shall be submitted
for review and approval;
4. Prior to Preliminary Plat approval by the City Council, a complete
drainage report shall be submitted for review and approval;
5. Prior to City Council approval of the Preliminary Plat, complete
road design plans shall be submitted for review and approval for the
construction of Severson Drive south of the existing terminus of Severson
Street and that Severson Drive shall be constructed in conjunction
with all of the other subdivision improvements;
6. Prior to Final Plat approval by the City Council, the plat shall
be revised to provide a 50 foot non-access easement along the Dixon
Court frontage of Lots 4 and 11 of Block 5 from the intersection of
Dixon Court and Severson Street and along the Dunham Lane frontage
of Lot 2 of Block 3 and Lot 3 of Block 4;
7. A Special exception is hereby granted to allow rollover curb with
curbside sidewalk in the Dixon Court cul-de-sac;
8. Prior to Preliminary Plat approval by the City Council, the engineer's
estimate shall be submitted for review and approval;
9. Design plans for Severson Street and any required revisions as
identified by the Engineering Division shall be submitted for review
and approval a minimum of ten working days prior to City Council approval
of the Preliminary Plat;
10. Prior to City Council approval of the Final Plat, a public right
of way shall be dedicated, an H-Lot granted to the City or a public
access and utility easement shall be provided and assigned to the
City for the public utilities and street improvements crossing the
adjacent property to the south;
Fire Department Recommendations:
11. All requirements of the Uniform Fire Code shall be continually
met;
12. Prior to the start of any building construction, fire hydrants
shall be installed and operational;
13. A Special Exception is hereby granted to allow for a dead-end
street in excess of 150 feet;
14. All streets, turnarounds and access shall comply with all the
requirements of the Rapid City Street Design Criteria Manual;
Urban Planning Division Recommendations:
15. Prior to Final Plat approval by the City Council all the subdivision
inspection fees shall be paid; and,
16. Prior to Final Plat approval by the City Council, surety for any
required subdivision improvements that have not been completed shall
be posted.
VOTE: (6 to 1)
|