Staff recommends that the Preliminary Plat be approved and that the Final Plat be continued to the February 18, 2002 City Council meeting as the stipulations of approval have not been met. PLANNING COMMISSION RECOMMENDATION: Planning Commission recommended that the Preliminary and Final Plat be approved with the following stipulations: |
||
|
||
|
1. |
Prior
to City Council approval of the Preliminary Plat, revised construction
plans and design reports for the required subdivision improvements shall
be submitted and the red lined initial submittal documents returned.
No construction of improvements shall be initiated prior to
approval of the construction plans; |
|
2. |
Prior
to City Council approval of the Preliminary Plat, a revised sewer plan
shall be submitted for review and approval.
In particular, the revised plan shall address the sewer basin
service area and sewer main sizing.
In addition, revisions to the master sewer plan shall be
submitted for review and approval showing the sewer system layout and
the future extensions to the north, west, east and south of the subject
property; |
|
3. |
Prior
to City Council approval of the Final Plat, a utility easement shall be
recorded at the Register of Deed’s Office granting a utility easement
for the sewer line. In
particular, the utility easement shall include that portion of the sewer
line to be located on the unplatted balance of the property.
In addition, an access easement shall be recorded at the Register
of Deed’s Office to allow access to the sewer line; |
|
4. |
Prior
to City Council approval of the Preliminary Plat, revisions to the
master water plan shall be submitted for review and approval showing the
water system layout including the transmission main extending to
Sheridan Lake Road and the proposed upper storage reservoir.
|
|
5. |
Prior
to City Council approval of the Final Plat, a utility easement shall be
recorded at the Register of Deed’s Office to allow a reservoir to be
located in the southwest corner of the subject property.
In addition, a Memorandum of Understanding shall be signed by the
applicant identifying when utility easement(s) shall be recorded at the
Register of Deed's Office for the future water transmission line from
the Red Rock Estates to Sheridan Lake Road, to the proposed upper
storage reservoir lot and for the site of the future upper storage. |
|
6. |
Prior
to City Council approval of the Preliminary Plat, calculations, reports
and/or other information to document the extent of necessary drainage
improvements, including detention facilities, necessary to manage storm
runoff from the subdivision shall be submitted for review and approval.
In addition, a drainage plan addressing the design of all
drainage components shall be submitted for review and approval; |
|
||
Fire
Department Recommendation: |
||
|
7. |
A
Special Exception shall hereby be granted to allow a 750 foot and a 900
foot long cul-de-sac, respectively, in lieu of the maximum 500 foot long
cul-de-sac length required by the Street Design Criteria Manual with the
stipulation that prior to City Council approval of the Final Plat, the
applicant shall enter into a covenant (with the City) running with the
property requiring that all residence(s) located beyond 500 feet to be
sprinkled; |
|
||
Urban
Planning Division Recommendations: |
||
|
8 |
Prior
to City Council approval of the Final Plat, a Variance to the
Subdivision Regulations shall be obtained to allow the lot length to be
greater than twice the lot width, or the plat shall be revised to comply
with the length to width requirement; |
|
9. |
Prior
to City Council approval of the Final Plat, a subdivision estimate form
shall be submitted for review and approval; and, |
|
10. |
Prior
to City Council approval of the Final Plat, surety for any required
subdivision improvements that have not been completed shall be posted
and the subdivision inspection fee shall be paid. |
VOTE: (9 to 0)