No. 05PL010 - Skyline Pines Subdivision
A request by Sperlich Consulting Inc. for Thomas Gagliano to consider an application for a Preliminary Plat on Lots 8A, 8B and 9R, Block 2, Skyline Pines Subdivision, and a portion of the dedicated right-of-way of Sandstone Lane, located in the SE1/4 of the SW1/4 of Section 11, T1N, R7E, BHM, Rapid City, Pennington County, South Dakota, legally described as Lots 8 and 9, Block 2, Skyline Pines Subdivision, located in the SE1/4 of the SW1/4, Section 11, T1N, R7E, BHM, Rapid City, Pennington County, South Dakota, more generally described as being located at 1501 Pevans Parkway and 3289 Sandstone Lane.

Staff recommends that the Preliminary Plat be continued to the April 4, 2005 City Council meeting as the stipulations of approval have not been met.

PLANNING COMMISSION RECOMMENDATION:

Planning Commission recommended that the
Preliminary Plat
be approved with the following stipulations:

1.
Prior to Preliminary Plat approval by the Planning Commission , a geotechnical analysis with slope stability information shall be reviewed and approved to insure that slope stability exists for the proposed building envelopes;
2.
Prior to Preliminary Plat approval by the Planning Commission , a drainage plan in accordance with the Meade Hawthorne Drainage Basin Design Plan shall be submitted for review and approval. In addition, access to proposed Lot 8A, across the Major Drainage Easement, shall be constructed in compliance with that drainage plan;
3.
Prior to Preliminary Plat approval by the Planning Commission , a revised plat be submitted showing the dedicated right-of-way for the existing access easement. The access easement is classified as a lane place street requiring that the street be located within a minimum 45 foot wide right-of-way and constructed with a minimum 20 foot wide paved surface. In addition, road construction plans for the access easement shall be submitted for review and approval. In particular, the road construction plans shall show the dedicated right-of-way for the access easement along with plans for the curb, gutter, sidewalk, water, sewer and pavement;
4.
Prior to Preliminary Plat approval by the City Council, a subdivision cost estimate shall be submitted for review and approval;
5.
All Uniform Fire Codes shall be continually met;
6.
Prior to submittal of a Final Plat application, written documentation from all of the affected utility companies shall be submitted identifying concurrence with the relocation of the utility easements along the common lot lines;
7.
Upon submittal of the Final Plat application, surety for any required subdivision improvements that have not been completed shall be posted and the subdivision inspection fees shall be paid; and
8.
Prior to Preliminary Plat approval by the City Council, applicant needs.  

VOTE: (7 to 0 with Anderson, Andrews, Brown, Hadcock, LeMay, Prairie Chicken and Schmidt all voting yes and none voting no)