No. 04PL142 - Trailwood Village Subdivision
A request by Sperlich Consulting, Inc. for Ed and Linda Eisenbraun to consider an application for a Preliminary Plat on Lot BR, Trailwood Village located in the SE1/4 of the SW1/4, Section 10, T1N, R8E, BHM, Pennington County, South Dakota, legally described as a portion of Tract T of Trailwood Village, and Lot B of Trailwood Village located in the SE1/4 of the SW1/4, Section 10, T1N, R8E, BHM, Pennington County, South Dakota, more generally described as being located at the intersection of Covington Drive and Avery Street.


PLANNING COMMISSION RECOMMENDATION:
Planning Commission recommended that the
Preliminary Plat be approved with the following stipulations:

1.
Prior to Preliminary Plat approval by the City Council, road construction plans shall be submitted for review and approval for S. D. Highway 44. In particular, the road construction plans shall show the street constructed with curb, gutter and sidewalk or a Variance to the Subdivision Regulations shall be obtained;
2.
Prior to Preliminary Plat approval by the City Council, a site plan showing all structural improvements, fences, including lot lines, dimensions, approach location, adjacent right-of-way widths and setbacks shall be submitted for review and approval;
3.
Prior to Preliminary Plat approval by the City Council, a cost estimate of the subdivision improvements shall be submitted for review and approval;
4.
Prior to submittal of a Final Plat application, the plat document shall be revised to show an access restriction easement along S. D. Highway 44;
5.
Prior to submittal of a Final Plat application, sidewalks shall be completed along Avery Drive and Covington Street and a no outlet street sign shall be posted on Avery Drive along with crack sealing as needed on street or surety shall be posted for the improvements;
6.
Prior to submittal of a Final Plat application, drainage improvements shall be in place. In particular, temporary and permanent stabilization of surfaces to prevent sediment washing into streets and off the property;
7.
Upon submittal of the Final Plat application, surety for any required subdivision improvements that have not been completed shall be posted and the subdivision inspection fees shall be paid; and,
8.
Prior to submittal of a Final Plat application, the plat document shall be revised to show the existing 8 foot wide utility and minor drainage easement, book 30 and page 66 (1 & 2), to be vacated this plat.  

VOTE: (9 to 0 with Rodriguez, LeMay, Brown, Anderson, Fast Wolf, Hadcock, Nash, Prairie Chicken and Schmidt voting yes and with none voting no)